close menu
This website uses cookies to store your accessibility preferences. No personal / identifying information is stored. More info.

Shoreland Zoning (SZ)

Shoreland Zoning Ordinance
WordPDF
Shoreland Zone Permit Application
WORDPDF
Shoreland Zoning Map
PDF
Waterford Shoreland Zoning Buffer Protection Standards



** Deadline for application submissions - Two weeks before the third Wednesday meeting **

Application basics

A.  Acquire permit application from the Town Office or online at waterfordme.org.

B.  If the structure requires an installation of a wastewater disposal system or expansion of an existing system, a soils analysis and wastewater disposal system permit must accompany this application.

C.  If item B, is required, Question 31, Section A, B and C must be completed and signed by the Code Enforcement Officer and Plumbing Inspector PRIOR to the Planning Board review.

D.  Any additional permits, approvals and/or reviews required on Page 6 of the application must be acquired or completed PRIOR to final review by the Planning Board.

E.  Copy of Deed must accompany application.

F.  Photographs of the lot to be developed and/or the structure to be renovated are required with the application (front, rear and side views).

G.  Any questions regarding the permit application will be answered at any regularly scheduled Planning Board meeting or may be answered by contacting a Planning Board member for assistance.

I.   All applications shall be submitted with five copies two weeks in advance.

An application for a permit shall be accompanied by a non-refundable fee of $25 plus $1 per $1,000 of the estimated cost including materials and labor over $2,000. This application fee shall be made by cash or check, payable to the Town of Waterford.